Bulk · Workforce · Enterprise

Workforce Housing.

Bulk-priced modular for data centres, construction camps, energy projects, and disaster recovery. Selected for a 5,000-unit framework agreement with a UK enterprise client — 2,400 sold, 200 in production now.

From $52K–$85K per unit at volume
Min order
10 units
Framework
5,000-unit UK
Delivery
9–18 weeks per batch
Capsul workforce housing — aerial view of installed camp
Workforce housing — aerial
Capsul workforce deployment · installed, occupied, operating at scale
Specification

Spec'd for camps. Built for years.

Per-unit footprint
6m · 12m · multi-occupancy
Occupancy
Single · double · bunked configs
Sanitary
En-suite or shared block options
Climate
HVAC · cold/hot climate spec
Frame
Steel · weatherproof · stackable
Camp infra
Mess hall · ablution · laundry
Power
Grid · generator · solar-hybrid
Relocatable
Yes · designed for re-deployment
Volume capacity
Up to 1,000+ units / year
Warranty
10-year structural · backed by Capsul
How enterprise procurement works

One framework. Many drawdowns.

01
Framework agreement

Sign once. Draw down units as project needs scale. Per-unit pricing locked at framework signature — protected against later cost movement.

02
Capsul-employed QC at scale

Same five-stage inspection on every unit, whether you order ten or five thousand. Quality doesn't drop because volume rises.

03
Single point of accountability

Every framework is signed by Capsul. Every warranty is backed by Capsul. Your procurement team has one contract, one supplier, one line of escalation.

Who it's for

Six sectors buying workforce at scale.

01
Data centre construction

Hyperscale builds require 100–500-bed accommodation for trades, security, and operations. Our 80-unit Scandinavia deployment hit occupancy in nine weeks.

02
Mining and resources

Remote-site camps for FIFO and DIDO operations. Designed for extended-life deployments with full hospitality and ablution infrastructure.

03
Energy and renewables

Wind, solar, and grid-infrastructure projects in remote locations. Solar-hybrid camp configuration available for off-grid sites.

04
Major construction

Infrastructure builds — road, rail, port, dam — needing 12-to-36-month accommodation. Deploys faster than concrete. Recoverable at project end.

05
Disaster recovery

Post-event housing for displaced residents and emergency workers. Capsul-employed QC means units arrive habitable, not project-spec.

06
Defence and government

Capsul has appropriate security clearance pathways for procurement with defence and government agencies. Engagement under NDA.

Camp layout

Per-unit spec. Camp-scale deployment.

Per-Unit · 4-Person En-Suite
6m × 3m · ~210 sq ft4 PERSON · EN-SUITE · DESK · LOCKERS
SHOWER
WC
VANITY
EN-SUITE
BUNK 1
BUNK 2
LOCKERS
BUNK ROOM (4)
DESK
CHAIR
STORAGE
DESK + STORAGE
Volume pricing4 personEn-suiteLockers + desk
Camp · 80-Unit Deployment
Site plan · 4 rows × 20 units80 UNITS · MESS · ABLUTION · LAUNDRY · PLANT
MESS HALLABLUTIONLAUNDRY
PLANT
SITE PLAN · 80 UNITS
Framework pricing80 units~320 bedsShared infra

Brief workforce procurement.

Tell us project size, site location, expected duration, and any compliance requirements (defence, government, ISO supply-chain). Framework proposal within five business days.

Request framework pricing Email the team

Designed in Chicago · ISO-9001 production · Capsul-employed QC · Certified to your local code · 10-year warranty backed by Capsul